ASPC Tucson Rincon Door and Lock Replacement

Tucson, Arizona, USA | August 2007 - April 2009

Project Manager: James Johnson

Led by Project Manager James Johnson, the ASPC Rincon Door and Lock Replacement was a remodel on an existing facility. It was completed in March 2009. The Rincon Unit consisted of 9 housing units that required the replacement of 375 swing type doors with Southern Folger sliders and Willo Products doors, and the installation of nine control stations.

Despite the difficulty of finding and training a crew in such a remote location, Sierra finished the project one month ahead of schedule and has retained the staff hired for ASPC for our other projects in Arizona.